Skip to content Skip to footer
HomeProjectsDPS Schools

DPS Schools — Indoor Activity & Play Zone

India
DPS
Installed for DPS Schools BIS-certified install
DPS Schools indoor activity and play zone, India
The brief

A dedicated space for movement, not just a spare classroom

DPS Schools wanted a purpose-built indoor space where early years students could climb, slide and play safely, regardless of the weather outside — not a repurposed classroom with a few mats thrown down.

The room needed to double as a learning environment too, with a world-map rug and visual elements that quietly reinforced geography and shapes even during free play.

What they needed

  • Wooden climbing structures and a slide suited to ages 3–7
  • Soft, impact-absorbent flooring across the whole activity area
  • Durable materials that would hold up to years of daily climbing
  • A room that blended learning cues into free-play time
The solution

A themed activity room, built and installed in-house

Popcorn Furniture designed a wooden climbing structure with an integrated slide, cushioned mat flooring and a themed world-map rug, manufactured in-house to BIS safety standards with rounded edges and non-toxic finishes.

What went into the space

  • Climbing structure — multi-level timber frame with an integrated slide
  • Impact-safe flooring — cushioned mats across the full activity zone
  • Themed rug & visuals — world-map design for informal learning
  • Storage & shelving — for toys, mats and activity materials
Inside the activity room

Project gallery

DPS Schools — indoor play zone
"
Rainy days used to mean cancelled play time. Now our students have a safe space to climb, slide and burn off energy every single day.
Head of Early YearsDPS Schools
How we delivered it

From concept to a ready-to-play space

01

Site survey & concept

On-site assessment of the room and a themed activity-zone concept plan.

02

Safety-led design

Structures and flooring engineered to BIS child-safety standards.

03

In-house manufacture

Climbing structures and storage built and finished in-house.

04

Install & handover

On-site assembly, safety testing and a staff walkthrough before handover.

More projects

Explore similar campuses

Planning a campus fit-out?

Tell us about your school and our design team will put together a space plan and quote — just like we did for DPS Schools.

Talk to our design team